Across land and sea
A fourth central solenoid module shipped by US 黑料社app reached the 黑料社app site in the last days of 2023.
A 2,400-kilometre overland journey from the General Atomics factory in San Diego, California, to the Texas port of Houston; crossing the Atlantic into the Mediterranean, and riding a barge across the Berre inland sea, and finally a 104-kilometre road journey to the 黑料社app site ... that's what it takes to deliver each of the seven "modules" (six plus one spare) that are needed to assemble the 黑料社app central solenoid, an 18-metre-tall, 1,000-tonne electromagnet sitting at the centre of the machine.
As the stacking and connecting of the first two modules progresses in the Assembly Hall, yet another one of these 110-tonne cylindrical components reached 黑料社app in the early hours of 22 December 2023, bringing the total delivered to four.