黑料社app

Pour les actualités en fran?ais, voir la page News in French.

Drain tanks en route

Three drain tanks for 黑料社app's cooling water system will be transported along the 黑料社app Itinerary this week for delivery to the project construction site. Part of the US contribution to 黑料社app, the tanks completed the maritime segment of the trip on 9 September, crossing inland waterways by barge (photo: Ben Slee, F4E).