ºÚÁÏÉçapp

Pour les actualités en français, voir la page News in French.

Drain tanks en route

Three drain tanks for ºÚÁÏÉçapp's cooling water system will be transported along the ºÚÁÏÉçapp Itinerary this week for delivery to the project construction site. Part of the US contribution to ºÚÁÏÉçapp, the tanks completed the maritime segment of the trip on 9 September, crossing inland waterways by barge (photo: Ben Slee, F4E).