ºÚÁÏÉçapp

Pour les actualités en français, voir la page News in French.

Vacuum PA countersigned by US ºÚÁÏÉçapp

15 Apr 2011 - Lynne Degitz, U.S. ºÚÁÏÉçapp
Ray Johnson, Wayne Steffey, Mike Hechler, Dave Rasmussen and Walt Gardener looked on as US ºÚÁÏÉçapp Project Manager Ned Sauthoff signed off on the Procurement Arrangement for ºÚÁÏÉçapp Vacuum Auxiliary Systems on 14 April 2011, which was finalized on schedule. The ºÚÁÏÉçapp and US vacuum teams will now move ahead with final design and fabrication for the main piping components, including pipe runs, pipe run supports, and vacuum leak testing equipment.