The ºÚÁÏÉçapp Itinerary is tested a second time in 2014, including the maritime leg of the journey to the ºÚÁÏÉçapp site. In the picture, the 33-metre-long customized trailer and its mock load of concrete blocks (800 tonnes) is transported by barge along the Canal de Caronte, which connects the Mediterranean and the inland sea Etang de Berre.